CloudBox - HVAC LG VRF

  1. HVAC Communication Terminals
    HVAC outdoor connection
    mceclip2.png
    * Each LG refrigerant system should be wired separately, to a different HVAC port on CloudBox (L4-L7). Up to 4 LG refrigerant systems can be connected to CloudBox.

  2. Connecting to the line plug
    Secure the cables in the L7 line plug.

  3. Plugging to the CloudBox
    Insert the plug in to the CloudBox L7 socket.

  4. Check DIP Switches are set correctly
    Dip switches setup for VRF HVAC system on L7.

    mceclip1.png

mceclip0.png
Was this article helpful?
0 out of 0 found this helpful